Features

Three pillars, one job record.

Canopy Commander coordinates utility tree work end to end: the hazard report that starts a job, the assignment that moves it to a crew, and the triage that decides what happens first when a storm hits.

Pillar 01 · Coordination

Assignment, crews, and status in one place

The core of the product: getting reported work to the right crew and knowing where every job stands without a phone call.

Job 2291 · Circuit 14B

Handoff

Tracked
  • LinemanSubmitted

    Reports the hazard

    Pole 447-B · leaning oak on primary

  • ForemanAssigned

    Assigns the crew

    Crew 3 · Priority 1 · today 09:00

  • Tree crewComplete

    Cuts and closes out

    Removed · photos attached · 41 min

One record, from report to closeout

Assignment and dispatch

A foreman assigns a reported hazard to a named crew with a priority and a work window. The crew sees it on their list the moment it is assigned.

  • Priority levels that match how utilities escalate work
  • Reassign or reprioritize without re-entering the job
  • Access notes, equipment needs, and hazards carried on the assignment

Crew rosters and load

See which crews are working, what they are holding, and how much is still open before you dispatch the next job.

  • Crew list with current assignments and open count
  • Foreman view across every circuit in a callout
  • Balance work across crews instead of overloading one truck

Status everyone can see

Submitted, assigned, on site, complete. The lineman who reported the tree sees the same status the foreman does.

  • Live status on every job with time stamps
  • Notifications when a job is assigned or closed
  • No status meeting to find out what is still open

Job records and reporting

Every job keeps its report, assignment, photos, and closeout, so what you hand the utility matches what happened in the field.

  • Circuit, span, and pole reference on each record
  • Timestamped entries for restoration reporting
  • Export a callout's jobs as a single summary

Pillar 02 · Hazard reporting

The person who finds it, files it

Linemen and patrollers report trees threatening the line in under a minute, with enough detail that a crew can work the job without calling back.

Structured field reports

Preset fields instead of free text: what the tree is doing, how urgent it looks, and exactly where it is. Consistent reports make triage possible.

  • Preset failure types: uprooted, split leader, limb contact, full lean
  • Pole, circuit, and span reference captured on the report
  • Glove-sized inputs, readable in daylight or headlamp

Photos attached to the job

The photos taken at the moment of the report follow the job all the way to the crew and into the record.

  • Multiple photos per hazard with location
  • Crew sees the original photos before rolling
  • Closeout photos stored alongside the report

Works where the signal doesn't

Storm work happens on back roads with no bars. Reports are captured on device and sync when service returns.

  • Local capture with background sync
  • Nothing to load before you can start a report
  • A dead zone never costs you a job record

Pillar 03 · Storm triage

When everything is urgent, rank it

The original wire load engine, now the triage layer: when a circuit takes multiple failures at once, the queue sorts itself by the force each stem puts on the conductor.

Sector 14B · Primary line

Removal priority

Loaded
  • T-04Red oak, split leader
    3,410 lbf
    Priority 1
  • T-07Silver maple, uprooted
    2,640 lbf
    Priority 2
  • T-02White pine, leaning
    1,630 lbf
    Standby
  • T-11Ash, limb contact
    670 lbf
    Hold
Estimated from field inputs · verify before cutting

Force on the wire, tree by tree

Canopy Commander estimates the load each contacting stem transfers to the conductor from lean, contact height, stem size, and failure type — then ranks them.

  • Per-tree estimated force with a relative load bar
  • Highest-priority removal flagged in high-vis orange
  • Sequence warns when releasing one stem reloads another

A ranked board, not a pile

During a mass outage the foreman assigns straight off the ranked board, so crews work the most imperative removals first.

  • Bulk intake of reports across a circuit
  • Ranking drives assignment order automatically
  • Reprioritize as new reports come in

The cut order in the crew's hand

The crew opens the job and sees the removal order for that span, not a number they have to interpret.

  • Ranked removals per span with notes
  • Notes attach to the tree, not a separate log
  • Estimates presented as guidance, verified on site

Next

See how a job moves between the three roles.

View the workflow

Want to see it on your circuit?

Request a demo