Workflow

From a lineman's report to a closed-out cut.

Canopy Commander is one shared record that three different roles work from. Nobody re-types the job, and nobody has to call around to find out where it stands.

Job 2291 · Circuit 14B

Handoff

Tracked
  • LinemanSubmitted

    Reports the hazard

    Pole 447-B · leaning oak on primary

  • ForemanAssigned

    Assigns the crew

    Crew 3 · Priority 1 · today 09:00

  • Tree crewComplete

    Cuts and closes out

    Removed · photos attached · 41 min

One record, from report to closeout

Life of a job

Five stages, one record.

01

The report lands

A lineman spots a hazard on patrol or during a restoration and files it from the truck: pole and circuit reference, location, photos, and what the tree is doing to the line. It hits the queue immediately instead of a voicemail.

02

Triage sets priority

The report is scored against everything else open. On storm work, the force ranking sorts contacting stems by the load they put on the conductor so the most imperative removals rise to the top of the board.

03

The foreman assigns

Work is dispatched to a named crew with a priority and a window. Crews see their own list; the foreman sees every open job across the circuit and who is holding it.

04

The crew works the job

The crew gets the pole, the access notes, the photos, and the cut order on their phone. Status moves from assigned to on site to complete without a phone call.

05

Closeout becomes the record

Completion photos, notes, and time stamps attach to the job. The utility gets a report that matches what actually happened in the field, pulled from a lookup instead of a reconstruction.

By role

Everyone gets the part of the job that is theirs.

Lineman

Identifies the issue and needs tree work done.

  • A structured report form built for a truck window
  • Photo capture with pole and circuit reference
  • Status on every hazard they have reported
  • Confirmation when the tree actually comes off

Foreman

Triages the queue and assigns the right crew.

  • One board of every open hazard on the system
  • Priority ranking, including storm force ranking
  • Crew rosters, availability, and current load
  • Assignment with priority, window, and notes

Tree crew

Does the cutting and closes the job out.

  • Today's assigned jobs in priority order
  • Pole location, access notes, and original photos
  • Removal order when several stems load one span
  • One-tap closeout with photos and time on job
Storm mode

When the whole circuit goes down at once.

During a mass outage the same flow compresses. Reports come in faster than any one person can read them, so triage does the sorting: stems are ranked by the force they put on the conductor, the most imperative removals surface first, and the foreman assigns straight off the ranked board.

  • Bulk intake of hazard reports across a circuit
  • Force ranking sorts the queue instead of guesswork
  • Sequence warns when releasing one stem reloads another
  • Crews work down the board without a dispatch call

Sector 14B · Primary line

Removal priority

Loaded
  • T-04Red oak, split leader
    3,410 lbf
    Priority 1
  • T-07Silver maple, uprooted
    2,640 lbf
    Priority 2
  • T-02White pine, leaning
    1,630 lbf
    Standby
  • T-11Ash, limb contact
    670 lbf
    Hold
Estimated from field inputs · verify before cutting

Want to see this run on your circuit?

Request a demo